The “hold” in “hold point” refers to putting a hold on construction activities until an inspection is passed. Construction inspection hold points are particularly important when work cannot be inspected later because a problem could be covered up. For example, a hold point before a concrete pour permits verification of steel reinforcing before it is covered with concrete.